Skip to main content

News

Strohm, Siemens Gamesa to partner on offshore wind-to-H2 infrastructure

Strohm and Siemens Gamesa signed an MOU to develop hydrogen transfer solutions that improve the decentralized green hydrogen concept, whereby green hydrogen is generated in each wind turbine generator and transported to shore by a subsea pipe infrastructure. In this concept power cables are replaced by a pipe infrastructure, storing and transferring hydrogen. Siemens Gamesa has a technical advisory role.

Strohm's Thermoplastic Composite Pipe (TCP), produced at its plant in The Netherlands, consists of corrosion-resistant technology that does not fatigue or suffer from issues associated with using steel pipe for hydrogen, such as embrittlement. Manufactured in long spoolable lengths and flexible in nature, the pipe can be pulled directly into the wind turbine generator, quickly and cost effectively building an offshore wind farm infrastructure.

TCP does not require any maintenance and is suitable for over 30 years in operation, lowering the levelized cost of electricity (LCOE) to a minimum and enabling the decentralized concept solution. 

Siemens Gamesa  has already taken significant steps in shaping the industry and developing the basis for a  decentralized offshore solution, that fully integrates an electrolyzer into an offshore wind turbine, with clear benefits and value-add potential such as capex reduction, increase of system efficiency, and increase of wind farm uptime.

 

Connect with H2Tech