Skip to main content

News

Plug Power to operate two liquefaction plants in US

Plug Power has placed an order for two 15 t/d liquefaction plants. This is in line with Plug Power’s previously announced strategy to build the first green hydrogen generation network in the US.

The hydrogen liquefaction plants will utilize Chart’s helium refrigeration technology, cold box design, and the associated rotating equipment. This order includes the supply of the hydrogen liquefaction system, liquid hydrogen storage tanks, and trailer loadout bays.

Delivery is scheduled for the second quarter of 2022.The liquefaction system will utilize gaseous hydrogen from Plug Power’s in-house electrolyzers and renewable electricity. The US-based plants will be located in the Mid-Atlantic and Southeast, and are expected to be online before the end of 2022.

Connect with H2Tech