H2H Saltend is a 600-megawatt low-carbon H2 production plant with carbon capture, the first of its kind and scale, helping to establish the Humber as an international hub for low-carbon H2. The plant design will use Linde Engineering’s H2 and air separation technologies, which will be combined with UK-based Johnson Matthey’s LCH technology.